Main Project Experiences: Government Client

Preparation of Detail Project Reports (DPRs) of IWMP Projects: Rayagada, Odisha

  • Matching/Rectification of satellite Data with ground realities, Digitization of Cadastral and other Maps.
  • Preparation of Digitized Cadastral Map, (2) Base Map, (3)Digital Elevation Model (DEM) Map, (4) Slope Map, (5)Soil Type/Texture Map, (6)Soil erosion Map, (7) Soil Depth Map, (8)Geomorphology/Land use/Land cover Map, (9)Land use Capability Classification (LCC) Map, (10)Contour Map, (11)Satellite imagery, (12) Ground Water Map, (13) Digitization of Treatment/Watershed Development Plan Map etc
  • Final DPR Preparation of 8 clusters watershed

Preparation of Detail Project Reports (DPRs) for Diversion scheme in Raipur, Nawagaon Division, Water Resource Department, Chhattisgarh

  • Total Station Survey and DGPS survey
  • Matching/Rectification of satellite Data with ground realities, Digitization of Cadastral and other Maps.
  • Preparation of Digitized Cadastral Map, (2) Base Map, (3)Digital Elevation Model (DEM) Map, (4) Preparation of Contour Maps (1m), (5)Command Area planning and mapping, (6)Fixation of Canal Alignment (8ha), (7) Soil Map, (8)Geomorphology/Land use/Land cover Map, (9)Index Map, (10) Submergence area Map (FRL contour)
  • Hydrology and Detailed Design
  • Preparation of Unit-I, Head work and Unit-II Canal estimation, and BOQs

Impact evaluation of projects of UP Water Sector Restructuring Project (UPWSRP)

  • Data Collection / Analysis & Project Report
  • Project Impact Evaluation by Third Party
  • Sampling for Household Survey for Impact assessment
  • Data Collection and Stakeholder Interaction
  • The following Monitoring Indicators / Parameters are to be assessed
  • Agricultural Intensification and Diversification
  • Agricultural Production and Income:
  • Social Assessment
  • Participatory Irrigation Management
  • Environmental Assessment
  • Quality Assurance
  • Data Entry and Management
  • Data Analysis and report preparation

Monitoring of UPWSRP project activities

  • Monitoring & Scheduling
  • Use of standard subject specific survey and field assessment technique based on models of estimation, Use PRA techniques such as resource mapping, seasonality, Venn diagram, transect walk, etc
  • Conventional Survey techniques (Questionnaire, Group discussions, focus group and individual interactions (For this the Consultant team will hire local people / NGOs).
  • Workshop of consultant team members for preparation of advance Summary findings and outline of final Concurrent Evaluation Report
  • A suitable and meaningful monitoring and evaluation systems will be designed to improve the timeliness and quality of the information available on implementation and operation, thereby improving the planning of future project processes.

Flood Vulnerability Assessment of Four Major Cities in Gujarat

  • Assess the flooding hazard risk for each of the four major cities of the state viz. Ahmedabad, Surat, Vadodara and Rajkot (municipal corporation area plus urban development authority area) and the extent of vulnerability;
  • Quantify the risks emanating from the vulnerability assessed for each of these cities; and to
  • Provide a set of recommendations, which would help reduce/eliminate the flooding vulnerability/risk. The solutions recommended should as far as possible be linked with the existing master plans which, when implemented over a period of time, will give city managers an edge in handling flooding situations (such as cloudburst / river overflow / dam burst / cyclone / storm surge / tsunami).
  • Assessments Hazard, Risk and Vulnerability
      • Hazard Assessment which includes Collection and analyze historical information, GIS Mapping, Flood modelling, preparation of hazard maps.
      • Vulnerability Assessment includes Assessing vulnerability to flooding, Field Assessment, Detailed assessment of economic vulnerability, Economic Analysis Report, GIS based flood vulnerability maps.
  • Risk Assessment includes assessing risks by flooding hazard, Calibrated risk parameters statistically and analytically, GIS based flood risk maps, Damage assessments for each area, Recommend mechanisms.
      • Recommendations phase includes identification and evaluation of risk treatment options with the objective of reducing the impact of future floods.

 Main Project Experiences: Corporate Client

  • ADB funded project for Consultancy Services for “Survey, Design & Related Services of Canals and Structures on Main & Distributaries Canals of Pattamundai Canal System, Odisha, India
  • Hydraulic design for sewerage master plan for Delhi Jal Board, Hydrological analysis of rivers in Uttarakhand under Uttarakhand Urban Infra Projects, and Technical proposal in IWRM, Survey, design and  irrigation project and flood management projects
  • Identification, Survey, Preparation of DPR’s (Detailed Project Reports) and Detailed Estimates of Balance Medium and Minor Irrigation Dams Projects in Narmada Basin (Group-B) from Omkareshwar Dam site to Gujarat State boundary for 1,60,000 ha of CCA. Narmada Valley Development Authority
  • WRD institutional strengthening; planning And design, Chhattisgarh Irrigation Development Sector Project with Water Resource Department, Chhattisgarh, Funded By:  ADB-Asian Development Bank
  • Scheme Productivity and Improvement Project for Madhya Pradesh Water Sector Restructuring Project
  • Ghaghara – Gomti Basin Social & Environmental Assessment and River Basin Planning.
  • Training and Capacity Building of UPSLRP- with the assistance of World Bank & IDA
  • Uttar Pradesh Water Sector Restructuring Project-Imamganj& Nagpur Distributory Area (Bharaich, Pratapgarh& Sultan Districts).
  • 3rd Party Assessment of EIA for Allahabad Bypass Project (World Bank / NHAI)
  • Regional Urban Environmental Policy and Management Support Program of USAID’s Regional Urban Development Office for South Asia (RUDO/ SA) Client (Nuchem Weir Ltd./ RUDO/ USAID)
  • Off site Emergency Plan for Kota district (Ministry of Environment and Forests, Govt. of India)
  • Off site Emergency Plan forRatnagiri&Satara district(Ministry of Environment and Forests, Govt. of India)
  • Investment plan for 5 municipalities under mini master Plan for 33 municipalities in India(JBIC)
  • Capacity building of Ministry of Environment & Forests, Govt. of India for developing environmentally sound projects (TERI/ADB)
  • Tamil Nadu Empowerment and Poverty Reduction project with World Bank – Technical Environmental Guidelines (World Bank / Govt. of Tamil Nadu)
  • GhaghraGomti River Basin Social and Environmental Assessment (BESA) (PACT,UP Water Sector Restructuring Project / World Bank)
  • Study of Issues and Opportunities in Municipal Solid Waste Management in India (World Bank)
  • EIA Study for Proposed Landfill site at Narela – Bawana Road, Delhi (MCD)
  • Monitoring Study for Existing Landfill Site at Okhla Phase – I, Delhi (MCD)
  • Monitoring Study for Existing Landfill Site at Gazipur, Delhi (MCD)
  • Geographical Information System For Emergency Planning and Response for Major Cluster of Industries in Punjab (NIC)
  • Geographical Information System For Emergency Planning and Response for Major Cluster of Industries in Uttar Pradesh (NIC)
  • Specialized Training Programs/ Workshops for Industrial Personnel at Middle and Top Management level under Energy Efficiency Capacity Building initiatives (IREDA / World Bank)
  • EIA Study (Rapid) of Proposed Channelization of Large Drains / Rivers. (Drainage Circle, UP Sodic Land Reclamation Project / World Bank)
  • Developing Environmental and Social Management System for NHAI and an Operational Manual (NHAI)
  • Consulting Services for SAPROF for HussainSagar Lake and Catchment Area Improvement Project
  • Detailed Survey of Municipal Solid Waste Collection, Characterization and Transportation for Municipal Corporation of Delhi